Demolition in Saint-Léonard
Saint-Léonard is our own neighbourhood. Our yard is on rue Jarry Est, which makes the borough the sector where we mobilise fastest, often the same day for an estimating visit The building stock is very distinctive, mostly bungalows, duplexes and triplexes built between the 1950s and the 1970s during the area's rapid expansion
- RBQ 5835-4499-01Valid licence
- CNESST certifiedStandards up to date
- $5M insuranceCivil liability
- Quote within 24hFirm price
The building stock of Saint-Léonard and what it changes on site
Saint-Léonard is our own neighbourhood. Our yard is on rue Jarry Est, which makes the borough the sector where we mobilise fastest, often the same day for an estimating visit. The building stock is very distinctive, mostly bungalows, duplexes and triplexes built between the 1950s and the 1970s during the area's rapid expansion. That period lines up exactly with the years when asbestos and vermiculite were in common use, in joint compounds, floor tiles and attic insulation. On practically every Saint-Léonard job, testing beforehand is justified.
Dominant building stock Bungalows, duplexes and triplexes from the 1950s to the 1970s, some newer apartment buildings and a retail fabric along Jarry and Lacordaire.
Three ground realities in Saint-Léonard
Our home sector
The yard is on Jarry Est. Same day estimating visits are often possible, with fast mobilisation for post loss emergencies.
A 1950s to 1970s stock
The era when asbestos and vermiculite were standard. Testing beforehand avoids a work stoppage mid job.
A lot of partial demolition
Extensions, load bearing wall openings, bungalow conversions. The work is more surgical than a full teardown.
What we do in Saint-Léonard.
The Saint-Léonard sectors we cover.
- Secteur Jarry
- Secteur Lacordaire
- Secteur Viau
- Secteur Langelier
- Domaine Renaissance
- Secteur Provencher
- Secteur Robert
- Boulevard Métropolitain
Who issues the demolition authorisation
The demolition authorisation certificate application is filed with the borough of Saint-Léonard. We prepare the file, submit it and follow the application through to issue. We also coordinate service disconnection with the utilities before work starts.
What people ask us in Saint-Léonard.
Travel is included in the quote everywhere in Greater Montréal, so the price does not change with distance. Proximity does make us more responsive, with a faster site visit and an earlier start when the schedule is tight.
Yes. Any building built or renovated before 1990 must be checked before work likely to disturb materials. On a bungalow from that era the sensitive points are joint compounds, floor tiles and their adhesive, and vermiculite in the attic.
No. Travel is included in the quote everywhere in Greater Montréal. The price depends on the nature of the job and access constraints, never on distance.
Yes, always, with no obligation. Our estimator comes out, assesses the site in person and gives you a detailed firm price quote within 24 to 48 hours.
A demolition project in Saint-Léonard ?
Our estimator visits free of charge, assesses your site in person and issues a firm quote within 24 to 48 hours.