Demolition in Montréal-Nord
Montréal-Nord developed mainly in the post war years, between the 1950s and the 1970s, and its building stock is very homogeneous as a result. Many duplexes, triplexes and small three to six unit apartment buildings, put up quickly during the expansion period That homogeneity has a practical advantage, you roughly know what to expect before even entering the building
- RBQ 5835-4499-01Valid licence
- CNESST certifiedStandards up to date
- $5M insuranceCivil liability
- Quote within 24hFirm price
The building stock of Montréal-Nord and what it changes on site
Montréal-Nord developed mainly in the post war years, between the 1950s and the 1970s, and its building stock is very homogeneous as a result. Many duplexes, triplexes and small three to six unit apartment buildings, put up quickly during the expansion period. That homogeneity has a practical advantage, you roughly know what to expect before even entering the building. It also has a direct consequence, almost the entire stock dates from the asbestos era, which makes prior assessment essential on practically every job. The borough borders Saint-Léonard, so it is minutes from our yard.
Dominant building stock Duplexes, triplexes and small apartment buildings from the 1950s to the 1970s, with retail along the main arteries.
Three ground realities in Montréal-Nord
A very homogeneous stock
Post war duplexes and triplexes. Methods are proven and timelines easy to state precisely.
Almost everything predates 1990
Asbestos assessment is justified on nearly every job in the sector.
Minutes from our yard
The borough borders Saint-Léonard. Fast visits and short mobilisation.
What we do in Montréal-Nord.
The Montréal-Nord sectors we cover.
- Secteur Pie-IX
- Secteur Lacordaire
- Secteur Henri-Bourassa
- Nord-Est
- Secteur Langelier
- Secteur Rolland
- Secteur Charleroi
- Bord de la rivière
Who issues the demolition authorisation
The demolition authorisation certificate application is filed with the borough of Montréal-Nord. We prepare the file, submit it and follow the application through to issue. We also coordinate service disconnection with the utilities before work starts.
What people ask us in Montréal-Nord.
For an interior strip out of one unit, allow three to five working days. For partial demolition touching the structure, one to two weeks depending on scope and required shoring. A positive asbestos test adds one to two weeks for analysis and contained removal.
Yes, it is a frequent request in the sector. We empty and clean up the unit between leases on a tight schedule to limit the period without rental income, and hand over the compliance documents.
No. Travel is included in the quote everywhere in Greater Montréal. The price depends on the nature of the job and access constraints, never on distance.
Yes, always, with no obligation. Our estimator comes out, assesses the site in person and gives you a detailed firm price quote within 24 to 48 hours.
A demolition project in Montréal-Nord ?
Our estimator visits free of charge, assesses your site in person and issues a firm quote within 24 to 48 hours.