Estimator offline Request a callbackQuote
Service area

Demolition in Repentigny

Repentigny developed mainly from the 1960s and 1970s onwards, on the classic north shore low rise model, with large lots, wide streets and a regular residential grid. That stock is now reaching the age where owners weigh heavy renovation against teardown and rebuild, which sustains steady demand The Le Gardeur sector adds an older component to the territory

  • RBQ 5835-4499-01Valid licence
  • CNESST certifiedStandards up to date
  • $5M insuranceCivil liability
  • Quote within 24hFirm price

The building stock of Repentigny and what it changes on site

Repentigny developed mainly from the 1960s and 1970s onwards, on the classic north shore low rise model, with large lots, wide streets and a regular residential grid. That stock is now reaching the age where owners weigh heavy renovation against teardown and rebuild, which sustains steady demand. The Le Gardeur sector adds an older component to the territory. The low rise layout makes jobs simple, machinery comes in via the driveway, the bin sits in the drive and haulage happens without a street occupancy permit in most cases.

Dominant building stock 1960s and 1970s single family homes and bungalows on large lots, an older sector in Le Gardeur, retail along the main arteries.

Demolition in Repentigny

Three ground realities in Repentigny

A stock reaching maturity

Houses from the 1960s and 1970s are reaching the age where owners weigh heavy renovation against rebuilding.

Simple logistics

Large lots, wide driveways, bin in the drive. No street occupancy permit in most cases.

Period materials

Joint compounds, floor tiles and vermiculite. Testing beforehand applies to almost the entire stock.

Coverage

The Repentigny sectors we cover.

  • Repentigny centre
  • Le Gardeur
  • Secteur Notre-Dame
  • Secteur Iberville
  • Secteur Brien
  • Secteur Valmont
  • Bord du fleuve
  • Secteur Larochelle
Authorisation

Who issues the demolition authorisation

The demolition authorisation certificate application is filed with the Ville de Repentigny planning department. We prepare the file, submit it and follow the application through to issue. We also coordinate service disconnection with the utilities before work starts.

FAQ

What people ask us in Repentigny.

It is a financial call that depends on the condition of the structure, the value of the lot and your plans. Our role is to give you the real cost of demolition, with or without foundation removal, so you can compare on firm figures rather than rough estimates.

Three to seven working days once the permit is issued and services are disconnected. The open access typical of the sector lets us work with good sized machinery, which shortens the job compared with a constrained lot on the island.

No. Travel is included in the quote everywhere in Greater Montréal. The price depends on the nature of the job and access constraints, never on distance.

Yes, always, with no obligation. Our estimator comes out, assesses the site in person and gives you a detailed firm price quote within 24 to 48 hours.

A demolition project in Repentigny ?

Our estimator visits free of charge, assesses your site in person and issues a firm quote within 24 to 48 hours.

Call