Demolition in Lachine
Lachine was shaped by the canal and the industry that settled along it, and the territory still carries that structure. There are former industrial sites under transformation, an old village core with heritage buildings, and post war residential sectors Redevelopment projects along the canal have brought a great deal of selective demolition and stripping of older buildings, often with partial structural retention
- RBQ 5835-4499-01Valid licence
- CNESST certifiedStandards up to date
- $5M insuranceCivil liability
- Quote within 24hFirm price
The building stock of Lachine and what it changes on site
Lachine was shaped by the canal and the industry that settled along it, and the territory still carries that structure. There are former industrial sites under transformation, an old village core with heritage buildings, and post war residential sectors. Redevelopment projects along the canal have brought a great deal of selective demolition and stripping of older buildings, often with partial structural retention. Older industrial stock calls for the same asbestos vigilance as elsewhere, with the added question of soils and materials inherited from past activity.
Dominant building stock Former industrial buildings along the canal, a heritage village core, post war residential.
Three ground realities in Lachine
Industrial heritage
Older buildings under redevelopment, frequently with structural or façade retention and selective demolition.
A regulated village core
Around Vieux-Lachine, visible work is closely reviewed. The regulatory file takes time.
Inherited materials
Pipe lagging, sprayed fireproofing and old renders in industrial buildings. Assessment is unavoidable.
What we do in Lachine.
The Lachine sectors we cover.
- Vieux-Lachine
- Saint-Pierre
- Duff Court
- Bord du canal
- Secteur Notre-Dame
- Secteur Victoria
- Dixie
- Secteur 32e Avenue
Who issues the demolition authorisation
The demolition authorisation certificate application is filed with the borough of Lachine. We prepare the file, submit it and follow the application through to issue. We also coordinate service disconnection with the utilities before work starts.
What people ask us in Lachine.
Yes, through selective demolition. We retain the structure, masonry or façade depending on what the project and the borough require, and remove only what has to go. Those elements are identified and protected during the survey, before the first removal.
They depend on the sector. In the old core and on heritage buildings, the review is more in depth and may go before a committee. In post war residential sectors the process is more direct. We give you the realistic timeline at the site visit.
No. Travel is included in the quote everywhere in Greater Montréal. The price depends on the nature of the job and access constraints, never on distance.
Yes, always, with no obligation. Our estimator comes out, assesses the site in person and gives you a detailed firm price quote within 24 to 48 hours.
A demolition project in Lachine ?
Our estimator visits free of charge, assesses your site in person and issues a firm quote within 24 to 48 hours.